Shell and core, Cat A, Cat A+ and Cat B explained

Fit-out and design. 6 minute read. Published 21 November 2026.


Shell and core is a bare building. Cat A is a finished but empty floor. Cat B is your office. The terms describe how far a space has been fitted out, and therefore how much work, money and time stands between you and moving in.

They are industry shorthand, not legal definitions, so what a particular landlord means by Cat A can vary. Always ask for the specification in writing.

The four levels at a glance

LevelWhat you getWho usually paysReady to work in?
Shell and coreStructure, cladding, lifts, lobbies, toilets. Bare concrete floors.DeveloperNo
Cat ARaised floor, ceiling, lighting, basic air conditioning, painted wallsLandlordNo
Cat A+Cat A plus meeting rooms, kitchen and often furnitureLandlordYes
Cat BYour layout, rooms, finishes, furniture, technology and brandingTenantYes

Shell and core

The building is weathertight and its common parts are finished, but the office floors are concrete slabs with services capped off at the riser. You see this in brand new buildings and in ones stripped back for refurbishment.

Taking a floor at this stage lets you design everything once, with no waste. It also means doing the landlord-style base works yourself, which adds cost and several weeks, so tenants who do it normally negotiate a contribution from the landlord in return.

Cat A

This is how most conventional office space is presented to the market. A typical Cat A floor has:

  • A raised access floor with a void for cables
  • A suspended ceiling, or exposed services finished to be seen
  • Lighting on a regular grid
  • Air conditioning and ventilation laid out for open plan
  • Fire detection and basic life safety systems
  • Painted walls and finished window sills

It has no meeting rooms, no kitchen, no furniture and no data cabling. You cannot work in it. It is a blank, serviced floor waiting for a tenant's fit-out.

Cat A+

Sometimes called fitted, turnkey or plug and play. The landlord carries on past Cat A and builds a generic office: a few meeting rooms, a tea point, reception, sometimes desks and chairs.

For a tenant the attractions are speed and a much smaller upfront bill. The compromises are that the layout was designed for nobody in particular, the cost is recovered through a higher rent, and you may still need to add your own technology and branding. It suits smaller teams and shorter leases well.

Cat B

Cat B is the fit-out that makes a floor into a particular company's office. It typically covers:

  • Partitions and doors for meeting rooms, offices and booths
  • Changes to air conditioning, lighting and fire alarm to suit the new rooms
  • Power and data to every desk and room
  • Kitchen, breakout areas and reception
  • Flooring, wall finishes, joinery and signage
  • Meeting room technology
  • Furniture

The awkward truth about Cat B is that it starts by undoing some of Cat A. Ceilings come down where walls go up, lights are moved, carpet tiles laid for the letting photographs are replaced. This waste is one reason landlords increasingly offer a floor part-finished and a contribution instead.

What each costs

As a guide for 2026, per sq ft and before VAT:

WorksTypical range
Cat A, from shell£40 to £80
Cat B building works, from Cat A£65 to £130, more for premium
Furniture£20 to £60
AV and IT£5 to £15

London sits at the top of each range. The detail is in how much an office fit-out costs.

Why it matters when you leave

Leases usually require you to remove your alterations at the end and hand the space back in the condition you received it. If you took Cat A, that means stripping out your Cat B and reinstating Cat A, at your expense. This is the core of most dilapidations claims, commonly £15 to £25 per sq ft.

So the level you take at the start sets the bill at the end. If you take a Cat A+ floor, make sure the lease is clear that the landlord's fit-out stays. If you take shell and core and build both stages, agree in writing what you must put back. Our article on dilapidations explains how the claim works.

Which should you take?

  • Short lease, small team, need to be in quickly: Cat A+ or a managed office.
  • Five years or more, and the office matters to how you work or how clients see you: Cat A and your own Cat B.
  • Large requirement, long lease, particular technical needs: consider shell and core with a landlord contribution, so nothing is built twice.

Whatever you choose, get the landlord's specification and a test fit before agreeing terms. A floor described as Cat A with tired ceilings and ageing air conditioning can cost more to fit out than a shell.