Relocate or refurbish? How to decide

Fit-out and design. 6 minute read. Published 15 November 2026.


When a lease is coming to an end, there are three choices, not two: move, stay and refurbish, or stay as you are. The right one depends less on how tired the office looks than on whether the building can still do what you need for the next five years.

Start with the building, not the decor

A refurbishment can change almost everything about an office except four things. If any of these is wrong, no amount of new carpet fixes it.

  • Location. Has the commute become a reason people leave or turn down jobs? Have your clients moved?
  • Size. Is the floor much too big or too small, with no option to take or give back space in the same building?
  • The building's bones. Low ceilings, poor daylight, deep floors, weak ventilation, not enough lifts or toilets for your headcount.
  • The landlord. Unwilling to invest in the building, refusing consent to alterations, or planning to redevelop.

If all four are fine, staying deserves serious thought. If one is badly wrong, you are probably moving.

How the two compare

Refurbish and stayRelocate
Works costLower if the layout largely staysHigher: a full fit-out
Other one-off costsFewRemovals, dilapidations, legal and agent fees, overlap rent
DisruptionHigh: works around your staff, or a temporary move outLow until move weekend
TimeAbout 4 to 9 monthsAbout 6 to 18 months
Negotiating positionGood, if the landlord wants to keep you and believes you might goGood, if you start early
Chance to change how you workLimited by the existing floorWide open

The case for staying

Staying avoids the costs that have nothing to do with a better office. You do not pay dilapidations yet. You do not pay for a move, or for two offices during a fit-out. You keep an address clients know and a commute staff have built their lives around.

It also gives you something to trade. A landlord facing an empty floor, a letting agent's fee and months without rent will often offer a rent-free period, a contribution to works or a reduced dilapidations liability to renew. You only get those if the landlord believes you might leave, which means running a real search alongside the conversation.

The hard part is the works. Refurbishing around people is slower, noisier and more expensive per square foot than working on an empty floor. The usual approaches are phasing the works floor by floor or zone by zone, doing noisy work out of hours, or moving everyone out to temporary space for a few weeks. Allow about 20% longer on site than for an empty floor.

The case for moving

Moving is the only way to change location, size or building quality. It is also the cleaner way to change how the company works: shared desks, more collaboration space or a different balance of rooms are easier to introduce in a new place than to impose on a familiar one.

Newer buildings bring better air, daylight and energy performance, which shows up in running costs and increasingly in whether staff want to come in. And if you need less space than before, moving may be the only way to stop paying for the excess.

The costs are real, though, and several are easy to miss. Our article on the hidden costs of moving office lists them.

Run the numbers the same way for each

Compare options over the same period, normally the length of the new lease. For each one, add up:

  1. Rent, service charge and business rates for the term, net of any rent-free period
  2. The cost of the works, furniture and technology
  3. One-off costs: the move, legal and agent fees, dilapidations if you leave
  4. Any landlord contribution, as a credit
  5. What you would pay to exit or reinstate at the end

Divide by the number of years and by headcount. A cost per person per year lets you compare a cheap refurbishment of an oversized floor with a smart fit-out of a smaller one on equal terms, and the answer is often not the one people expected.

A quick test

Stay and refurbish if most of these are true:

  • The location still works for staff and clients
  • The floor is within about 15% of the size you need
  • The building's air conditioning, lifts and daylight are acceptable
  • The landlord is willing to deal
  • You can tolerate works in phases

Move if most of these are true:

  • You need substantially more or less space
  • Hiring or attendance suffers because of where or what the office is
  • The building needs investment the landlord will not make
  • You want to change how people work, not only how the place looks

If the answers are mixed, cost both properly before deciding. A test fit of your current floor and one or two alternatives, with a budget for each, takes a few weeks and turns an argument into a comparison.