Skip to content

Get introduced to an office fit-out specialist

Design and build of a new office, or a refresh of the one you have. Space planning, partitions, services, finishes and project management. Tell us about the project and we will introduce one specialist for each service you ask for. You are under no obligation.

  1. 1Your project
  2. 2Your details

Step 1 of 2: Your project

What would you like help with?

Tick any that apply.

A town or postcode.

When? (optional)

Fit-out

New space or refurbishment? (optional)

What you get


  • Design and build of a new office, or a refresh of the one you have.
  • Space planning that turns your headcount and ways of working into a layout.
  • Partitions, ceilings, lighting, heating, cooling and power: the building work and services.
  • Finishes, kitchens and meeting rooms chosen to a budget you have stated up front.
  • Project management from the brief to the day you move in.

What it costs and how long it takes

  • £60 to £250

    per sq ft for the building works in central London, from Essential to Premium finish. Elsewhere in the UK, from about 78% of that.

  • 4 to 14 weeks

    for design, depending on the size of the office

  • 6 to 20 weeks

    on site for a design-and-build fit-out, small office to very large

Planning figures, excluding VAT, furniture, technology, fees and contingency. Not a quotation.

Cost your fit-out

Before you talk to anyone

Frequently asked questions

Why do published fit-out costs disagree?

Because they measure different things. Contractor price guides usually quote construction only. Consultants' benchmarks usually quote everything, including furniture, technology, fees and contingency.

What should a fit-out budget include?

Start with the area and a specification level, and get a range, not a single number. Add furniture, technology, fees of around 10% and a contingency of 5% to 10% on a modern floor, more in an older building.

Does the starting condition of the floor change the price?

Yes. A Cat A floor is finished and empty. A shell needs floors, ceilings and services first, which adds roughly £40 to £80 per sq ft. A floor that is already fitted out can cost half as much, if you can live with someone else's layout.

What is the difference between design and build and a traditional fit-out?

With design and build you brief two or three fit-out companies, each proposes a design and a price, and you sign a single contract for both design and construction. With a traditional route, a designer draws the scheme first and every contractor prices the same drawings, so you can compare like for like.

When does design and build make most sense?

When speed matters. With one team and overlapping stages, a small project can go from brief to site in weeks. If your lease event is close, this often settles the question.

What protects me whichever route I choose?

Write a proper brief before anyone draws anything, state your budget so that proposals can be compared, and check the company as carefully as the design.