Who you need on an office move
Every supplier and adviser an office move can involve, what each one does, when to appoint them and which ones a small move can do without.
Guide, 8 minute read. Updated 24 November 2026.
Who you need on an office moveGuide
A large office move can involve twenty different firms. A small one needs five. The trick is knowing which five, appointing them in the right order, and understanding where one firm's job ends and the next begins, because the gaps between them are where moves go wrong.
The five you cannot do without
Whatever the size of the move, someone has to do these jobs.
| Who | What they do | Appoint them |
|---|---|---|
| Solicitor | Negotiates and documents the lease and the licence to alter. Checks what you must hand back at the end. | Before heads of terms are agreed |
| Agent acting for you | Finds space, including space not yet advertised, and negotiates rent, incentives and breaks. | At the very start |
| Fit-out company or designer | Tests whether the space works, designs it, prices it and builds it. | Before you commit to a building |
| IT provider | Orders connectivity, designs the network, moves and reconnects systems. | As soon as you have an address |
| Removal company | Crates, packing, transport, furniture, clearance of the old office. | Two to three months before the move |
If you are taking a serviced or managed office, the operator covers the fit-out and often the connectivity, and the list shrinks to a solicitor, your IT provider and a removal company.
Read the full guide
- The complete guide, free
- Every other guide and checklist on this site, in this browser
- Print or save any guide as a PDF
More guides
- Office relocation, step by stepThe eight stages of an office move in the order they happen, who does what at each one, and the decisions that cannot be left until later.
- How to choose a fit-out partnerHow to shortlist, brief and compare fit-out companies: the two ways to buy a fit-out, the questions that separate contractors, and a scorecard to mark them with.
- The office design processWhat happens between a blank floor plan and a set of drawings a contractor can build: the six design stages, what you sign off at each, and how long they take.