A Cat B office fit-out in the UK in 2026 typically costs between £65 and £130 per sq ft for the building works, before furniture, technology, fees and contingency. Add those and most projects land between £110 and £250 per sq ft all in, with central London at the top of every band.

That is a wide range, and the rest of this article explains what moves you up and down it.

The headline numbers

Published figures disagree because they measure different things. Contractor price guides usually quote construction only. Consultants' benchmarks usually quote everything.

Cushman & Wakefield's UK Office Fit Out Cost Guide 2026 gives these benchmarks per sq ft, which are generally quoted as all-in costs:

CityLowMediumHigh
London£148£243£359
Manchester£128£210£310
Birmingham£121£200£295
Glasgow£117£192£284

Those reflect corporate projects with a full professional team. A smaller design and build scheme at a sensible specification will often come in below the low column, which is why our calculator's range starts lower.

What the money is spent on

For a typical mid-range Cat B fit-out, the budget divides roughly like this.

ElementShare of totalWhat is in it
Mechanical and electrical25% to 35%Air conditioning changes, lighting, power, data, fire alarm
Partitions, doors and ceilings15% to 25%Meeting rooms, offices, glazing, acoustic treatment
Finishes and joinery10% to 20%Flooring, decoration, kitchen, reception, built-in furniture
Furniture15% to 20%Desks, chairs, meeting tables, soft seating, storage
AV and IT5% to 8%Screens, cameras, Wi-Fi, comms room
Fees, contingency and site costs15% to 20%Design, management, approvals, the unexpected

The first line surprises people. You can see walls and carpets. You cannot see the cost of moving air conditioning units so that each new meeting room has its own, but it is frequently the largest item in the budget.

Six things that move the price

1. What you are starting from. A Cat A floor is finished and empty. A shell needs floors, ceilings and services first, which adds roughly £40 to £80 per sq ft. A floor that is already fitted out can cost half as much, if you can live with someone else's layout. Our guide to shell and core, Cat A and Cat B explains the difference.

2. How many rooms you build. Every enclosed room needs walls, a door, lighting, cooling, fresh air and a fire alarm sounder. An office that is half meeting rooms and private offices can cost 15% to 20% more than an open one of the same size and quality.

3. Location. Labour, logistics and working restrictions make central London the most expensive place in the UK to build. The benchmarks above put major regional cities 15% to 20% lower.

4. The building. Older buildings hide things above ceilings. Listed buildings restrict what you can do and who can do it. Buildings with strict landlords limit noisy work to evenings and weekends, which costs more.

5. Specification. A glazed partition can cost three times what a plasterboard one does. Bespoke joinery, feature lighting and natural materials all add up quickly. Decide where quality will be seen, usually reception and client rooms, and be plainer elsewhere.

6. Speed. A compressed programme means overtime and paying to jump queues for materials. Giving the contractor two more weeks is often the cheapest saving available.

What is usually left out of a quote

When comparing prices, check whether each of these is in or out.

  • Furniture
  • AV equipment and IT hardware
  • Data cabling
  • Professional fees and landlord's approval fees
  • Building control fees
  • Out-of-hours working
  • Contingency
  • VAT

A quote that excludes most of that list can look 40% cheaper than one that includes it, for an identical office.

How to set a budget you can defend

Start with the area and a specification level, and get a range, not a single number. Add furniture, technology, fees of around 10% and a contingency of 5% to 10% on a modern floor, more in an older building. Then add the costs that are not fit-out at all but land in the same year: the move itself, dilapidations on the office you are leaving, and any months when you pay for two addresses. Our article on the hidden costs of moving office lists them.

Take that range to two or three fit-out companies with a clear brief, and ask each to tell you what they would do for the money. You will learn more from that than from asking for their cheapest price.

Want a second opinion on your numbers?

Tell us about your project and we will introduce one specialist for each service you ask for. You are under no obligation.

Ask a specialist