Office dilapidations explained: what tenants owe and how to pay less

Property and leases. 7 minute read. Published 20 November 2026.


Dilapidations are what you owe your landlord at the end of a lease for not leaving the premises in the condition the lease requires. In practice that means repairs, redecoration and removing the alterations you made. For an office it is commonly £15 to £25 per sq ft, which makes it one of the largest costs of moving, and the one most often left out of the budget.

This article explains how a claim is built, why the first figure is rarely the final one, and what to do from the first day of a lease to keep it down. It is general guidance; your own position depends on the wording of your lease, so take advice from a building surveyor and a solicitor.

What the lease asks for

Three kinds of obligation produce the claim.

Repair. Keeping the premises in repair, and handing them back that way. How far this goes depends on the wording and on whether a schedule of condition was attached at the start.

Redecoration. Usually at set intervals and in the final year.

Reinstatement. Removing your alterations and putting the space back as it was. If you took a Cat A floor and built meeting rooms, a kitchen and a comms room, reinstatement means taking them all out and making good ceilings, floors and services. This is normally the biggest part.

The licence to alter you signed when you fitted out usually spells out what must be removed. It is worth finding now.

How the process runs

  1. The landlord's surveyor inspects and prepares a schedule of dilapidations: a list of alleged breaches with a cost against each. It can arrive before or after the lease ends.
  2. You respond. Your surveyor goes through it line by line, agreeing some items, disputing others and challenging the prices.
  3. You choose: do the works or pay. If there is time before the lease ends, you can carry out the works yourself. Otherwise the parties negotiate a cash settlement.
  4. Settlement. Most claims are settled by negotiation between surveyors, without going near a court.

Why the opening number is not the answer

A schedule of dilapidations is the landlord's opening position. Several things commonly reduce it.

  • Items that are not breaches. Fair wear that the lease allows, or defects that were there when you arrived, particularly if a schedule of condition proves it.
  • Overpricing. Rates above what a contractor would charge, or duplicated items.
  • Works the landlord will never do. In England and Wales, a landlord's damages for disrepair are limited by statute to the amount the property's value has actually fallen. If the landlord is going to strip out and refurbish the floor anyway, or redevelop the building, your alterations may have cost them little or nothing. This argument, often called supersession, can remove a large share of a claim.
  • Betterment. You are obliged to put things back, not to upgrade the landlord's building.

For these reasons settlements well below the first figure are common. That is not a reason to ignore the claim. It is a reason to have a surveyor who does this regularly on your side.

What it costs

Indicative figures for 2026, per sq ft of the office being handed back:

ScopeTypical range
Strip out your fit-out only£3 to £8
Strip out and basic making good£8 to £15
Full reinstatement to Cat A, with redecoration£15 to £25
Heavily altered space, or prime central London£25 to £35 and above

Add the landlord's surveyor and legal fees, which leases often make the tenant pay, and sometimes a claim for rent lost while the works are done.

Do the works, or pay?

Doing the works yourself gives you control of the cost and the specification, and avoids arguing about prices. It needs time: you must finish before the lease ends, while still running your business and moving out. Leave it too late and you can end up paying both for the works and for the landlord's loss of rent.

Paying a settlement is simpler and suits tenants who are busy moving. You depend on the negotiation, but you can leave earlier and let the landlord get on with their own plans.

Decide at least six months before the end of the lease, with a surveyor's estimate of both routes in front of you.

Break clauses need extra care

If you are leaving by exercising a break clause, check its conditions. Some breaks only work if you have complied with the lease, or given vacant possession, on the break date. Leaving partitions and fittings behind has been enough for a tenant to lose a break and remain liable for rent. Get legal advice on the exact wording before you serve notice.

How to keep the bill down, starting on day one

At the start of a lease

  • Insist on a schedule of condition with dated photographs, attached to the lease
  • Negotiate the reinstatement wording. Can the landlord's own fit-out stay? Is reinstatement only required if the landlord asks?
  • Keep the licence to alter and the drawings of what you built

During the lease

  • Maintain the space and keep records, particularly for air conditioning
  • Get consent for every alteration, so there is no argument later about what is authorised

In the final 12 to 18 months

  • Appoint a building surveyor to estimate the likely liability
  • Put a figure in the move budget
  • Ask the landlord what they intend to do with the space
  • Decide between doing the works and settling, and programme it into the move

The calculator has a dilapidations line you can switch on, so the exit from the old office sits in the same budget as the fit-out of the new one.