Refurbishing an office you already occupy usually costs less per sq ft than fitting out a new one, because you are not paying for a landlord's base build to be adapted and you are not paying two rents. Allow £80 to £115 per sq ft for a standard refurbishment in central London, less outside it.

What a refurbishment adds instead is the cost of working around people.

What you save by staying

No dilapidations claim, for now. The liability does not disappear, but it is not triggered by this project.

No overlap rent. A relocation usually means paying for two buildings for a period. A refurbishment does not.

No Cat A works. Taking a shell or stripped-back floor means paying £40 to £80 per sq ft before your own fit-out begins. In your own office, the ceilings, lighting and air conditioning are already there, and some of them can stay.

No property search. Months of senior time, agent fees and legal costs you do not spend.

What it costs you instead

Phasing. Refurbishing around a working office means doing it in sections, which is slower and more expensive than an empty floor. Expect a programme roughly a fifth longer, and a contractor price that reflects the same inefficiency.

Out-of-hours working. Noisy and disruptive work moves to evenings and weekends. That is a premium on labour and it is not small.

Decanting. People have to sit somewhere while their part of the floor is being built. Temporary desks, a hired space, or a period of everyone working from home.

Disruption you do not invoice. The cost that never appears in the cost plan is the one your own staff pay in noise, dust and moving twice.

Specification matters more than you expect

A refurbishment tempts people to do half a job. The floor gets new carpet and paint, the meeting rooms stay as they are, and two years later the same problems are still there.

Decide which of these you are doing before you price anything:

  • A refresh. Decoration, carpet, furniture, a tidy up of what exists. Cheapest, quickest, and it does not fix a layout that does not work.
  • A reconfiguration. Moving partitions, changing the mix of rooms and desks, usually with services alterations. This is where most of the value is when the problem is "the space does not suit how we work now".
  • A strip-out and rebuild. Effectively a new fit-out in a building you already have. Prices like one.

When moving is the better answer

Refurbishment stops being the cheaper option when:

  • You need significantly more or less space than you have
  • The building itself is the problem: poor services, bad floor plates, a location people cannot get to
  • Your lease has a break or an expiry coming, so you will face dilapidations soon anyway
  • The energy rating is poor and your landlord is not improving it

On that last point, the current legal minimum for letting commercial property in England and Wales is an EPC rating of E. In June 2026 the government confirmed that from 2031, privately rented commercial buildings over 1,000 sq m will need to reach EPC B, subject to secondary legislation and exemptions. If your building is a long way off that, it is worth asking the landlord what their plan is before you spend money on a refurbishment inside it.

Planning allowances, not quotations. A refurbishment price depends heavily on how much of the existing building you can keep.

Price a refurbishment and a move side by side with the budget calculator, and see office relocation or refurbishment for the wider comparison.