Moving IT without downtime

Moving day. 6 minute read. Published 25 November 2026.


The only reliable way to move an office network without downtime is to build the new one before you switch off the old one. Order the connectivity early, commission the new site while the old one is still running, and move people to a network that already works.

The thing that stops offices opening on time is almost never the furniture. It is the internet line.

Order the line first

A new business internet connection routinely takes around three months, and longer if the building needs new fibre or a wayleave from the landlord. Order it the day heads of terms are agreed, not the day the lease completes.

Order two circuits from different providers if the business cannot tolerate an outage. A single line is a single point of failure on day one, which is exactly when you can least afford it.

Check with the landlord which carriers already serve the building. An existing presence can turn three months into three weeks.

Build the new site before you leave the old one

The order that works:

  1. Connectivity ordered, as above
  2. Comms room ready: power, cooling, containment, racks and patching installed as part of the fit-out
  3. Cabling tested and certified before the contractor leaves site
  4. Core network live: switches, firewall, Wi-Fi access points configured and tested with real devices
  5. Phones proved on the new line, including inbound numbers
  6. Printers, door access, alarms, AV installed and tested
  7. Only then move people and desktop equipment

Each step depends on the one above. Skipping straight to step seven is how businesses end up tethering laptops to phones on Monday morning.

What to move, and when

Servers, if you still have them. The riskiest items. Move them out of hours, with a tested backup taken immediately before, and a documented rollback if they do not come up.

Anything cloud-hosted. Nothing to move. This is the main reason office IT moves are easier than they used to be, and it is worth checking how much of your estate still is not.

Desktops and monitors. Usually the removal company, in labelled crates, with IT reconnecting.

Laptops. People take them home. Simplest rule of all.

The comms room contents. Specialist handling. Do not let general removers unrack live equipment.

Plan for the gap

Even a good move has a period where some things are down. Decide in advance:

  • Which systems must never go down, and what the fallback is
  • Who is working from home on the Friday and Monday
  • Who is on site at 7am on Monday with a list and a phone
  • How people report a problem when the usual system is the problem

Tell everyone the answers before the weekend, not during it.

The small things that break Mondays

  • Printers not mapped to the new network
  • Door access cards not programmed, so nobody can get in
  • Meeting room screens with no cables
  • The old office's phone number not diverted
  • Nobody with keys to the comms room
  • Wi-Fi tested with one laptop, not with 80 people

Work through the IT and telecoms move checklist with your IT team or provider, and use the timescale calculator to see when the connectivity order has to be placed.